Designing a natural gas CO2 removal unit using aMDEA solvent. The regenerator reboiler duty is 26 MW, heated by a hot oil loop (supply 180 C, return 150 C). A single kettle reboiler comes out very large. What configuration options are there, and how do you estimate the required area?
(edited)